After the filling machine is used, pay attention to its maintenance. When disassembling and cleaning the piston and when maintaining, remove the fixing screws at the same time, so as not to affect the process requirements of the other when disassembling one. Before the liquid filling machine is cleaned, the remaining product should be cleaned up, and then the tank should be filled with gentle cleaning liquid. The cylinder has been lubricated before leaving the factory, please do not open or add any lubricating oil to ensure that the surface of the filling machine is clean and hygienic, and the power is cut off when it is not working. In addition, while maintaining and using the filling machine correctly, it is also necessary to conduct regular inspections and debugging. Only in this way can the filling machine work healthily and stably.
First of all, before using the filling machine, bottle brushing machine, and bottle washing machine, install the machine first and then debug it. Read the instructions carefully and prepare the tools used before debugging.
After the filling machine, bottle washing machine, and bottle washing machine are installed, the filling track and the bottle receiving tray are adjusted to the level, the liquid storage tank is full of materials, and all electrical switches are in the off position.
The filled container is inserted into the tooling box and connected to the external power supply. The power socket must be a three-pin socket and have a reliable grounding wire to prevent people from being shocked by leakage of the casing. Turn the power switch of the machine to ON and the power indicator light is on.
The supporting plate of the mounting rack supports the filling rack, and the positioning sleeve on the filling head is pushed upward with the finger. The positioning sleeve should be able to move up and down flexibly, with the filling needle exposed or retracted without hindrance.
Turn the switch under the liquid storage tank to the on position to enable the material to flow into the total metering pump. Adjust the screw on the crank according to the total volume of each container filling, and turn the knob of the filling speed control plate to about 20 degrees. Then turn the switch on the filling speed control board to the on position.
When the liquid flowing out of the filling head is the set amount, tighten the liquid volume fine-tuning nut, cover the shell of the filling head, and loosen the supporting plate of the filling rack.